Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Feuerbach
Log entry time 05:20:14 on February 15, 2007
Entry number 193330
keyword=extra 0.19 microamp runs
After talking with Doug about the VDC efficiency issues, we are going to
take one more run on each Ta, C, B4C and Li at 0.19 microamps to serve as
a check against the data taken at 0.4 microamps. Short R-HRS-only runs
will be taken between the target changes to verify the beam position,
since at that low current the BPMs do not work.
A copy of this log entry has been emailed to: brads@jlab.org, doug@jlab.org. gilman@jlab.org