Main INDEX
Monthly INDEX
PREV
NEXT
User name Ole Hansen
Log entry time 16:05:13 on February15,2007
Entry number 193397
keyword=Shift Summary
8:20 End Li run in preparation for calorimeter calibrations.
8:24 CODA run 6428 - beam calo calibs. Start logging run#114.
8:38 End calibrations
8:43 Resume physics data taking for a bit.
9:00 End production in preparation for more calibrations, followed by beam studies.
9:04 Start BCM calibs: CODA runs 6430/26408, log file 115
9:25- Beam studies underway
14:00 Controlled access- install 1msr collimator on left arm.
15:30 Moving to B target.
15:45 Beam studies ended. Tuning beam in hall.
15:55 Resume production with B target, 5uA.