Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 16:04:40 on March 09, 2007
Entry number 195341
keyword=Shift Summary
Day Shift March 9, 2007
SL John LeRose
TO Elena Khrosinkova
3rd Bob Michaels
E0= 2.649 (set value), 2.653 (Tiefenback)
Kin 2
Left: 21.433° 2.216 GeV/c
Right: 59.835° 0.989 GeV/c
08:06-08:30 1326 Target #5 Bismuth 0.11 Cu
08:34-09:11 1327 Target #5 Bismuth 0.11 Cu
09:11-10:18 1328 Target #5 Bismuth 0.16 Cu
10:18 MCC takes beam for Hall C Spin Dance. We take a controlled access.
Checking raster current pickup, coincidence timing, and removing a HAPPEX
ADC
from the right arm.
Moved right arm to 65.625° (Kin 4)
Rebooted Iocha14 for left arm magnets (controls were frozen)
11:54 MCC says they're having problems with the spin dance probably won't
have
beam until 14:00
runs 1329-1335 are assorted test runs
There is much concern re the inegrity of our targets and/or beam steering
through them. (See halogs from Bob Michaels)
15:50 Still waiting for beam. MCC says it will be a couple of hours.
There's still much puzzling and brainstorming re targets.
Spectrometers set for kin 4