• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 16:04:40 on March 09, 2007

    Entry number 195341

    keyword=Shift Summary

    Day Shift March 9, 2007
    SL John LeRose
    TO Elena Khrosinkova
    3rd Bob Michaels

    E0= 2.649 (set value), 2.653 (Tiefenback)

    Kin 2
    Left: 21.433° 2.216 GeV/c
    Right: 59.835° 0.989 GeV/c

    08:06-08:30 1326 Target #5 Bismuth 0.11 Cu
    08:34-09:11 1327 Target #5 Bismuth 0.11 Cu
    09:11-10:18 1328 Target #5 Bismuth 0.16 Cu

    10:18 MCC takes beam for Hall C Spin Dance. We take a controlled access.

    Checking raster current pickup, coincidence timing, and removing a HAPPEX
    ADC
    from the right arm.

    Moved right arm to 65.625° (Kin 4)
    Rebooted Iocha14 for left arm magnets (controls were frozen)

    11:54 MCC says they're having problems with the spin dance probably won't
    have
    beam until 14:00

    runs 1329-1335 are assorted test runs

    There is much concern re the inegrity of our targets and/or beam steering
    through them. (See halogs from Bob Michaels)

    15:50 Still waiting for beam. MCC says it will be a couple of hours.
    There's still much puzzling and brainstorming re targets.
    Spectrometers set for kin 4