• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J Lopez

    Log entry time 02:14:46 on March 10, 2007

    Entry number 195362

    keyword=Target status from physics replay

    In order to study the status of the Pb+C and Bi+C targets, the variables rb.Raster.target.dir.y vs rb.Raster.target.dir.x (Position of the Raster at the target) have been ploted for most of the runs. 4 plots are made for each run (or group of runs):

    1 ) With the whole number of events 2 ) With a cut in Emiss corresponding to the main Carbon peak 3 ) With a cut in Emiss corresponding to the outermost states of Pb or Bi, no carbon is expected within this cut 4 ) The large Emiss region, dominated by Pb or Bi.

    It can be seen that the bismuth content from the C+Bi+C target is irregular in the lower half from the very beginning of the experiment (run 1324), and that the lead in C+Pb+C is gone (run 1308) in a large area. The onset of the lead is in run 1209 and was gradually (and very slowly) growing during the following runs.




    Lead (Runs prior 1209)



    Lead (Runs 1209-1216) Initial problems



    Lead (Runs 1307-1308) Big problems



    Bismuth (First run: 1324)



    Bismuth (Better statistics: run 1326)