Main INDEX
Monthly INDEX
PREV
NEXT
User name S. Sirca
Log entry time 16:04:04 on March10,2007
Entry number 195438
keyword=Day shift summary
March 10 day shift / SL Sirca TO Zheng 3rd Margaziotis
08:00 run 1346: start current scan on Bi+C at 1 muA
08:42 run 1347: raster with 8 x 7.4 MCC values on 12C @ 10 muA
08:47 run 1348: raster with 6.4 x 9.2 MCC values on 12C @ 10 muA
08:55 revert to Bi+C target
08:59 run 1349: resume current scan on Bi+C @ 1 muA
09:57 run 1350: Bi+C @ 2 muA
10:23 run 1351: Bi+C @ 5 muA
11:43 run 1352: Bi+C @ 10 muA
12:08 run 1353: Bi+C @ 25 muA
12:32 run 1354: Bi+C @ 40 muA
12:56 run 1355: Bi+C @ 40 muA, production running
13:23 run 1356: Bi+C @ 40 muA
13:44 run 1357: Bi+C @ 40 muA
13:55 beam off for harp scan by MCC
14:29 harp scan done, move back to Bi+C target
14:37 run 1358: Bi+C @ 38 muA
15:03 run 1359: Bi+C @ 39 muA
15:27 run 1360: Bi+C @ 40 muA
15:46 run 1361: Bi+C @ 40 muA passed on to evening shift