    User name LeRose

    Log entry time 15:02:17 on March 23, 2007

    Entry number 197097

    keyword=Shift Summary (16:02)

    Shift Summary 3/23/07 Day
    John LeRose (SL)
    Ole Hansen (TO)
    Richard Lindgren (3rd)

    Kin09
    Right arm at 30.902°
    07:45-08:08 1862 Pb 40 microamps
    08:09-08:35 1863 Pb 40 microamps
    08:36-08:59 1864 Pb 40 microamps
    09:00-09:13 1865 Pb 40 microamps

    09:13 MCC takes beam away
    11:53 MCC working on energy spread (>5e-05)
    12:37 MCC going to "crest" the machine. Estimate 1 hour.
    14:10 MCC is analyzing data and suggests we take data while
    they do that. Spread is still not good, but they expect that
    after they analyze their data they will be able to improve it.


    14:14-14:42 1866 Pb 10 microamps
    14:30 MCC says in 5 minutes they'll take away the beam, drop out
    an rf zone, bring up another, and reLEM the machine (30 minutes)
    14:40 Beam Off
    Trickles of beam at end