Main INDEX
Monthly INDEX
PREV
NEXT
User name Ole Hansen
Log entry time 23:50:34 on April 6,2007
Entry number 197931
keyword=Shift summary
Spent all shift trying to establish center beam on the carbon hole target. Found that the hole is apparently off by 1.5 mm up and 2.2 mm left. Reprogrammed target ladder control to remove he vertical offset (important for HRS optics). Almost finished by the end of the shift. All runs takes were basically test runs for spot checks. Remaining open question is about the actual raster spot size. We believe that the size reported by spot++ is by about a factor of 2 too small.