    User name Solvignon

    Log entry time 16:00:34 on April15,2007

    Entry number 199164

    keyword=Shift summary

    8:00 Starting the shift with run# 2495 in progress.

    12:44 MCC called. Their injector expert is here. So they are now going to run some tests.


    12:57 MCC is going to work on the beam spot. So no beam in the hall for 30 to 45 minutes. Start a pedestal run.

    13:20 MCC ready to send beam.
    13:30 Beam current at 10 uA to check spot.

    14:39 FSD trip: MCC is trying to recover now.
    15:54 MCC called. They have an IOC that went bad and experts are coming. They cannot give an estimate of the time it will take.
    -------------------------------------------
    List of runs:
    ------------

    2495 07:51-08:31 80uA, 1.4M
    2496 08:31-09:10 80uA, 1.4M
    2497 09:10-09:53 80uA, 1.4M --> beamline HV alarm went off during the run (for 1 minute).
    2498 09:53-10:09 80uA, 550K --> beam halo
    2499 10:09-10:50 80uA, 1.4M
    2500 10:50-11:26 80uA, 1.4M
    2501 11:26-11:56 80uA, 1M --> left Q1 tripped. So stop the run.
    2502 12:02-12:42 80uA, 1.4M
    2503 12:43-12:44 80uA, 64K --> MCC is taking the beam for tests

    2504 12:52-12:53 pedestal run (beam still on)
    2505 12:57-13:19 pedestal run, 262K events

    2506 13:30-13:34 10uA, 11K --> check raster and BPM.
    2507 13:40-13:53 80-95uA,520K --> Spot++ shows a 4-peak feature in x.
    2508 13:54-14:31 95uA, 1.4M
    2509 14:31-14:48 95uA, 320K --> no beam for about 10min at the end of this run.