Sunday, April 15 Swing Shift
16:00 Shift began with no beam
16:50 MCC called, and they are ready to send beam to us
16:55 Had to (re)replace CAMAC power supply, taking beam away.
17:10 MCC called, and they are ready to send beam to us
17:15 Spot checked at low current (10uA), asked for 95uA
20:55 reduced current (heater load was low), then opened JT valve and
came back to 95uA
23:15 ROC4 hung up, rebooted, killed CODA, restarted CODA
Very nice quiet running. Apart from Q1 and CODA, no alarms and no surprises.
Run Summary
Run Events Notes
-----------------------------
2510 3k Spot++ check
2511 1.4M 95uA production run (did short replay (replay.C))
2512 1.4M 95uA production run
2513 1.4M 95uA production run
2514 1.4M 95uA production run
2515 1.4M 95uA production run (did short replay (replay.C))
2516 1.4M 95uA production run
2517 1.4M 95uA production run
2518 300k 95uA production run (Left Q1 trip)
2519 1.4M 95uA production run
2520 1.4M 95uA production run
2521 400k 95uA production run (did short replay (replay.C)) CODA crashed.
2522 1.4M 95uA production run
2523 95uA production run (started at 23:55)