User name V. Sulkosky
Log entry time 08:04:27 on April29,2007
Entry number 200486
keyword=Owl Shift Summary
00:00 Start shift in controlled access for raster repair.
00:15 Raster power supply has been replaced.
00:18 Ask MCC for beam permit. 40 uA beam with target OTR in.
00:32 Beam back in Hall A.
00:40 Lost communication with LeCroy HVs. Reboot iocha22.
01:22 Move to BeO target to check beam profile.
01:49 Horizontal raster died again.
02:16 Ask for Controlled Access to fix raster.
04:30 Finished replacing the horizontal raster power supply.
05:28 Move target to 4He to resume production running. Remove OTR.
Run Summary
-------------
Run # Begin End Comments
2957 00:35 00:54 Raster check after repair.
2958 00:54 01:07 Beam Profile check, raster 2 mm x 2 mm..
2959 01:09 01:21 Beam Profile check, raster 2.5 mm x 2.5 mm.
2960 01:46 02:01 BeO target, Beam Profile check, raster 2.5 mm x 2.5 mm.
2961-2964 04:46-05:28 Raster and OTR checks.
2965 05:40 06:08 4He target, 100 uA.
2966 06:09 06:36 4He target, 100 uA.
2967 06:36 07:10 4He target, 100 uA.
2968 07:10 07:39 4He target, 100 uA.
2969 07:40 -----