    Log entry time 16:01:54 on May11,2007

    Entry number 201724

    keyword=Shift Summary

    Started shift with production data taking in progress for kinematics 11, Q^2 = 61 fm^-2, E = 1.057 GeV. Run #3345.

    Around 9:25, the He cryo flow to the spectrometers dropped rapidly, causing almost all magnets to trip. The cryo group found that a compressor had shut off unexpectedly and restored flow. Resetting the magnets required a brief access. Magnets were back up around 11:35. The quads were cycled.

    Riad Suleiman performed beam position monitoring tests during some of the downtime. This did not cause us to lose data taking time because the HRS-R dipole was still ramping.

    Resumed production data taking with run 3348. Mostly smooth running thereafter, except for a 45-minute interruption of beam delivery due to accelerator problems. Beam current 105 uA for all runs.

    Run summary:


    Run# Start time #events Notes
    3345 07:54 0.988M Stopped early - no beam
    3346 08:36 1.25M
    3347 09:16 0.318M HRS magnets trip - cryo problems
    3348 11:37 1.25M
    3349 12:24 1.25M
    3350 13:03 1.25M
    3351 13:40 1.25M
    3352 15:01 1.25M
    3353 15:42 0.23M Ended early - no beam