Owl Shift Summary:
M. Olson, E. Khrosinkova
Shift began with run 3743 in progress
0011: End run 3743 (1.25M)
0118: End run 3744 (1.25M)
0128: End run 3745 to change prescales
0145: Requested beam current be lowered from ~85uA to 80uA in an effort to improve stability.
0237: End run 3746 (1.25M, many beam trips)
0300: MCC requests reduction in current to 70uA to try and improve stability
0402: End run 3747 (1.25M)
0515: End run 3748 (1.25M)
0517: End run 3749 to change PS3 from 2 to 1
0524: End run 3750 to change PS3 back to 2
0535: MCC requests reduction in current from 70uA to 60uA to try and improve stability.
0542: End run 3751 (271k) to adjust prescales for lower current
0715: End run 3752 (1.25M)
Switching to Al dummy target
0725: Dummy target in beam, request 40uA
0729: Run 3753 - Dummy target
Shift ended with run 3753 in progress