Main INDEX
Monthly INDEX
PREV
NEXT
User name Holmstrom
Log entry time 16:00:10 on May29,2007
Entry number 203500
keyword=Day Shift
Shift starts with no beam.
Previous shift has requested controled access so we can warm up the target and switch from 3He to 4He.
8:02 Start changing Left arm momentum to 2.030 GeV
8:20 Reboot left arm IOC
11:30 Moved left arm to 15.8 degrees
12:00 Started changing right arm momentum to 475 MeV
12:30 Charged Right arm angle to 69 degrees.
15:10 Mike S. called. The target should ready in 1-2 hours.
15:58 Target temperature is close at the end of the shift.