    User name Holmstrom

    Log entry time 16:00:10 on May29,2007

    Entry number 203500

    keyword=Day Shift

    Shift starts with no beam.
    Previous shift has requested controled access so we can warm up the target and switch from 3He to 4He.

    8:02 Start changing Left arm momentum to 2.030 GeV

    8:20 Reboot left arm IOC

    11:30 Moved left arm to 15.8 degrees

    12:00 Started changing right arm momentum to 475 MeV

    12:30 Charged Right arm angle to 69 degrees.

    15:10 Mike S. called. The target should ready in 1-2 hours.

    15:58 Target temperature is close at the end of the shift.