Main INDEX
Monthly INDEX
PREV
NEXT
User name Armando Acha
Log entry time 00:03:32 on June 3,2007
Entry number 204091
keyword=Swing Shift Summary
Swing Shift Summary:
Q2=63fm-2 Production on 4He.
BC= 52.5 aprox.uA
raster size 2.6mmx2.6mm
run 3995 0.5M events. Stopped to adjust PS factors. DT =12%
run 3996 0.8M events. Stopped. ROC2 failed. DT 1-2%. DAQ rebooted since ROC 2 terminal was not responding.
run 3997 1.25M events. DT 1-2%
run 3998 0.05M events. Testing with PS3=1 DT went to 9% and stopped and back to previous PS3=2
run 3999 1.25M events. DT 1-2%
run 4000 1.25M events. DT 1-2%
run 4001 1.25M events. DT 1-2%
BC was raised to 60 uA during run 4002
run 4002 1.25M events. DT 3%
run 4003 1.25M events. DT 3%
run 4004 ongoing
Nice shift :-)