    Log entry time 08:02:39 on June 4, 2007

    Entry number 204219

    keyword=Beam Time Accounting
    Hall A

    06/04/07 0000-0800
    Experiment #: E04-018
    Shift Leader: M. Olson
    Shift Workers: P. Decowski

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0.230.730.780.820.750.670.720.825.52
    Beam Available
    but Not in Use
    0.640.090.030.020.000.010.010.010.80
    Beam Not Available
    or Unacceptable
    0.130.180.200.170.250.330.280.171.72
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.370.951.001.001.001.001.001.007.32
    Planned Config-
    uration Change
    0.630.050.000.000.000.000.000.000.68
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: IAW with instructions from the RC, I have scaled the ABU and BNA values in the following manner: 1.) The average magnitude of the delivered current (not counting beam trips) was found using the TargetBPMs3 stripchart. 2.) This value was divided by 65uA to obtain a scale factor. 65uA is the maximum current we can presently take on the He4 target at this temperature and pressure. 3.) The ABU value was multiplied by this scale factor. 4.) The difference between the unscaled and scaled ABU values was then added to the BNA value. Note: The BANU value was not altered.

    Data Entry by: M.Olson