0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.23 | 0.73 | 0.78 | 0.82 | 0.75 | 0.67 | 0.72 | 0.82 | 5.52 |
Beam Available but Not in Use | 0.64 | 0.09 | 0.03 | 0.02 | 0.00 | 0.01 | 0.01 | 0.01 | 0.80 |
Beam Not Available or Unacceptable | 0.13 | 0.18 | 0.20 | 0.17 | 0.25 | 0.33 | 0.28 | 0.17 | 1.72 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.37 | 0.95 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 7.32 |
Planned Config- uration Change | 0.63 | 0.05 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.68 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: IAW with instructions from the RC, I have scaled the ABU and BNA values in the following manner: 1.) The average magnitude of the delivered current (not counting beam trips) was found using the TargetBPMs3 stripchart. 2.) This value was divided by 65uA to obtain a scale factor. 65uA is the maximum current we can presently take on the He4 target at this temperature and pressure. 3.) The ABU value was multiplied by this scale factor. 4.) The difference between the unscaled and scaled ABU values was then added to the BNA value. Note: The BANU value was not altered.
Data Entry by: M.Olson