    Swing Shift Summary

    SL: Armando Acha
    TO: Xinhu Yan

    Run Plan: Production Q2=68 fm-2 on 4He @ 65uA.

    run 4044 1.25M events. DT 2-3%.
    run 4045 1.25M events. DT 2-3%.
    run 4046 1.25M events. DT 2-3%.
    run 4047 1.25M events. DT 2-3%.
    run 4048 1.25M events. DT 2-3%.
    run 4049 1.25M events. DT 2-3%.
    run 4050 1.25M events. DT 2-3%.

    PS3 changed from 2 to 1

    run 4051 0.29M events. DT 12%.

    PS3 back to 2

    run 4052 1.25M events. DT 2-3%.
    run 4053 1.25M events. DT 2-3%.
    run 4054 0.62M events. DT 2-3%. Stopped for some beam tuning right at the end of this shift.

    We had beam during all the shift. Nice and smooth productive shift :-)