Main INDEX
Monthly INDEX
PREV
NEXT
User name E.Chudakov
Log entry time 17:47:20 on June 9,2007
Entry number 204902
keyword=Moller results
Moller measurement has taken about 1:20h net time, partly to tune the HV at this low energy and to check out the threshold effects.
The Moller beam tune took about 1h and the Wien angle change took about 2h, including beam retuning. Discussions of the Wien angle settings with the MCC took about 1h.
Results:
target 5: -42.3+/-0.2%
target 3: -41.2+/-0.3%
We asked the MCC to restore the regular settings at 17:40