User name Ramesh
Log entry time 23:56:42 on June 9,2007
Entry number 204977
keyword=Shif Summary
16:00 Moller work continueing
18:00 Waiting for beam after finishing the Moller work.
18:15 Beam back. Asked for 5 uA current. BeO target.
18:30 Asked MCC for harp scan.
18:35 Raster check on BeO and Carbon (holed) targets,
20:30 Start production run on 3He.
21:15 ROC2 died. Could not reboot from the console. Brad (RC) noticed
Ozone monitor readback was also dead.
21:32 Asked for control access in order to hard-reboot ROC2. Brad and Alex went down in the hall.
21:55 Controlled access finished. ROC2 is back now. Asked for beam.
22:05 Beam back.
22:28 Checking rates on different raster sizes (6x8, 9x12, and 12x18).
23:05 Raster scan complete.
23:06 Continueing taking data with raster sizer 3x4.