• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name X. Zheng

    Log entry time 17:22:03 on June16,2007

    Entry number 205645

    Followups:

    keyword=controlled access

    Around 17:00 MCC stopped delivering beam (we had about 20 minutes of 50uA beam in the Hall by then). We are going to controlled access to reboot the left detector hut IOC. (hareboot2 is not accessible). Tech on call is on his way.