• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name E. Schulte

    Log entry time 16:07:45 on June 17, 2007

    Entry number 205754

    keyword=Day Shift Log

    08:00 Shift starts with smooth running, 3He target, Radiator out, 52 uA
    at 4072.43 MeV beam energy.

    08:15 Now HRS-L Q2 is beeping! Is there any way to reset the limits to
    stop this annoyance? It's making it somewhat challenging to filter out
    real alamrs (of which there have been none, so far this shift).

    08:53 Changed to radiator in (6%) and requested 30uA beam current.
    Changed pre-scalers to radiator in conditions and restarted running with
    run number 1304.

    11:09 So far the shift has been running smoothly with good, stable beam.
    Only the annoying BEEP! of the drifting HRS-L Q2 to keep us awake!
    After running just over two hours at 30uA, the radiator temp is about 120
    deg.C. We still have about 2 runs to go with the radiator in, and then
    we'll switch back to radiator out for an hour.

    12:54 Removed radiator, resume running with 50uA.

    14:04 Finished Radiator out running and returned to 30uA radiator in
    running.

    16:00 Finished shift on radiator out running.