0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.80 | 0.96 | 0.87 | 0.80 | 0.85 | 0.21 | 0.74 | 0.88 | 6.11 |
Beam Available but Not in Use | 0.19 | 0.01 | 0.10 | 0.17 | 0.07 | 0.05 | 0.08 | 0.05 | 0.73 |
Beam Not Available or Unacceptable | 0.01 | 0.03 | 0.03 | 0.03 | 0.08 | 0.74 | 0.18 | 0.07 | 1.17 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.83 | 1.00 | 0.92 | 0.83 | 0.95 | 0.93 | 0.97 | 1.00 | 7.43 |
Planned Config- uration Change | 0.17 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.17 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.08 | 0.17 | 0.05 | 0.07 | 0.03 | 0.00 | 0.40 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.03 | 0.00 | 0.03 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.08 | 0.00 | 0.05 | 0.07 | 0.00 | 0.00 | 0.20 |
HRSR | 0.00 | 0.00 | 0.00 | 0.17 | 0.00 | 0.00 | 0.00 | 0.00 | 0.17 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: 08:00 Smooth running on target. 08:42 Changing target to 3He 10:48 Needed to work on some HRS-L electronics 11:44 HRS-R Q2 started drifiting. Forced back through feedback loop to try to get them to settle down. 12:57 HRS-L Q3 started acting up, trying to settle it caused the dipole to loose regulation. 13:04 Magnets back up and running 14:36 DAQ crashed 14:38 DAQ back 15:30 Radiator in
Data Entry by: E. Schulte