• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Beck

    Log entry time 23:59:40 on June24,2007

    Entry number 206531

    keyword=Shift summary

    kinematic: 2.5 GeV, P(Left HRS)=0.93GeV/c, thetaLab(Left HRS)=105.26
    P(Right HRS)=2.781GeV/c, thetaLab(Right HRS)=18.83

    16:15 - run 1515 is going on.
    run 1514-1517: He3 target, Radiator IN.
    run 1517 : The "end of run" was sent after the next run was started.

    1518: He3 target, Radiator OUT.
    1519: Junk run - very short because we didn't change the prescalers.
    1520-1522: He3 target, Radiator IN.

    10:15 - we got ready to move to the next kinematic point - 12C
    We checked visually that the way is clean and started the procedure according to the "How to":
    The Left HRS had problems moving, but it moved at the end (limits on current were increased) : 85 degrees, Vernier: -14
    Right HRS was moved to: 27.5 degrees, Vernier: ~ -16.5
    Momentum of Left HRS: 1.196 GeV/c
    Momentum of Right HRS:

    ---- New kinematic point 12C: 2.457GeV, th(RHRS)=27.599, P(RHRS)=2.57GeV/c, th(LHRS)=84.74, P(RHRS)=1.196 ----------------

    23:11 - Take optic run: 1523, optic target, radiator out
    23:35 - Take production data:
    run 1524: He3 target, Radiator IN.