Time Run # End # of events
8:00 continue kinematics 5D
8:04 1586 9:00 1M
9:00 enough event for 5D ->radiator out
adjust ps values for rad out (checked with run 1587)
9:04 1588 9:34 450 K
9:40 Switch to kinematic 5F
9:45 cannot move left spectrometer camera -> cannot position left arm
need an access to reboot controller
10:30 ready for beam
10:36 1589 optics run 87k
10:46 move He in and radiator in, turn raster on
10:55 1590 11:33 1M
11:34 1591 12:26 1M
12:26 1592 13:20 1M
take radiator out
13:30 1593 14:23 1M
place radiator in
14:30 1594 15:21 1M
15:23 1595 approx 0.5 M
Total on kinematics 5F: 4.5M Radiator in