    Owl Shift for Thursday June 28th, 2007


    Leader/TO: Bryan Moffit
    Worker: Khem Chirapatpimol
    Beam Energy: 0.849 GeV

    Summary

    Mostly production data, this shift. Lost EPICS readback of the radiator RTD.

    Significant Events

    • 00:00 Began shift with the start of Run 1608 on the 3He, 45µA, Radiator In.
    • 00:08 Xiaodong opens the FPP door.
    • 01:45 Radiator out. Asked for 50µA.
    • 02:08 A couple channels in the beamline HV crate tripped. Power cycled to bring them back up.
    • 02:50 6% radiator in, reduce beam current to 45µA.
    • 03:50 Noticed that we lost readback on the radiator temperature. Paged RC.
    • 04:38 Moving spectrometers to 67.32°
    • 04:46 Move to carbon optics. Radiator out. Ramp down raster.
    • 05:06 Move to 3He. Radiator In. Raster back on.
    • 06:00 Moving spectrometers to 65.32° Moved to carbon target.
    • 07:15 Radiator out. Asked for 50µA.
    • 08:00 Pass Run 1608 to day shift.

    Data Run Summary

    • 00:02 Run 1608 - Production Run (3He), radiator in. FPP Door opened near the end of this short run.
    • 00:09 Run 1609 - Production Run (3He). radiator in.
    • 01:09 Run 1610 - Production Run (3He). radiator in.
    • 01:49 Run 1611 - Background Run (3He). radiator out.
    • 02:51 Run 1612 - Production Run (3He). radiator in.
    • 03:47 Run 1613 - Production Run (3He). radiator in.
    • 04:53 Run 1614 - Optics Run (Carbon Optics). radiator out. Raster off. Stopped early.. high deadtime.
    • 04:56 Run 1615 - Optics Run (Carbon Optics). radiator out. Raster off.
    • 05:16 Run 1616 - Production Run (3He). radiator in.
    • 06:12 Run 1617 - Production Run (Carbon). radiator in.
    • 07:20 Run 1618 - Production Run (Carbon). radiator out.

    "Good news everyone!"