Leader/TO: Bryan Moffit
Worker: Khem Chirapatpimol
Beam Energy: 0.849 GeV
Summary Mostly production data, this shift. Lost
EPICS readback of the radiator RTD.
Significant Events
- 00:00 Began shift with the start of Run 1608 on the 3He, 45µA,
Radiator In.
- 00:08 Xiaodong opens the FPP door.
- 01:45 Radiator out. Asked for 50µA.
- 02:08 A couple channels in the beamline
HV crate tripped. Power cycled to bring them back up.
- 02:50 6% radiator in, reduce beam current
to 45µA.
- 03:50 Noticed that we lost readback on
the radiator temperature. Paged RC.
- 04:38 Moving spectrometers to 67.32°
- 04:46 Move to carbon optics. Radiator
out. Ramp down raster.
- 05:06 Move to 3He. Radiator
In. Raster back on.
- 06:00 Moving spectrometers to 65.32°
Moved to carbon target.
- 07:15 Radiator out. Asked for 50µA.
- 08:00 Pass Run 1608 to day shift.
Data Run Summary
- 00:02 Run 1608
- Production Run (3He), radiator in. FPP Door
opened near the end of this short run.
- 00:09 Run 1609
- Production Run (3He). radiator in.
- 01:09 Run 1610
- Production Run (3He). radiator in.
- 01:49 Run 1611
- Background Run (3He). radiator out.
- 02:51 Run 1612
- Production Run (3He). radiator in.
- 03:47 Run 1613
- Production Run (3He). radiator in.
- 04:53 Run 1614
- Optics Run (Carbon Optics). radiator out. Raster off.
Stopped early.. high deadtime.
- 04:56 Run 1615
- Optics Run (Carbon Optics). radiator out. Raster off.
- 05:16 Run 1616
- Production Run (3He). radiator in.
- 06:12 Run 1617
- Production Run (Carbon). radiator in.
- 07:20 Run 1618
- Production Run (Carbon). radiator out.