After LL was restored we reset all magnets accept both Q1s and right Dipole
Right Dipole power supply required a power cycle, then was fine
Right Q1 required power cycle of Saclay rack (thanks Scot)
Left Q1 required replacment of motherboard (thanks Scot and Jack)
began ramping magnets and exited Hall
A copy of this log entry has been emailed to: fansler@jlab.org