Main INDEX
Monthly INDEX
PREV
NEXT
User name Ramesh
Log entry time 23:58:43 on June29,2007
Entry number 207031
keyword=Shift Summary
16:00 No beam. All magnets down in both HRSs since an hour ago due to a sudden fluctuation in the He level.
16:15 Ed Folts checks in to go down the hall to power cycle all magnets of both spectrometers
17:15 Ed came out of the hall, started recycling Q2, Q3 of both spectrometers
17:27 MCC ready to deliver beam, asked for harp scan
17:49 Started spot test while right HRS was ramping up.
18:19 Finished spot check, right dipole still ramping up, BPMs look good, asked for taking away the beam since we no longer needed it at the moment.
20:00 Right HRS dipole up, asked for beam.
Time Run Target
20:04 1641 Carbon (hole) Rdiator OUT
20:21 1642 Carbon (optics) Radiator OUT
Run 1642 junk (stopped as soon as started because of wrong prescale setting)
20:44 Started production run
1644-1645 3He production runs Radiator IN
22:40 Left HRS Q3 crashed, could not bring it back, talked to RC and and he suggested to talk to Tech on call
22:50 Talked to Tech on Call (Ed Folts), Ed Folts coming, asked for Hall access.
23:10 Ed Folts checks in.
23:45 Q3 back on, Ed departs. Asked for beam.
23:58 No beam yet.