• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 04:09:35 on July 3,2007

    Entry number 207324

    keyword=FPP Plots after Left HV Trip

    Figure 1 shows the FPP chamber 4 wire groups before the left HV trip.
    Figure 2 shows the FPP chamber 4 wire groups after the HV trip.
    It appears the HV was not turned on correctly for X1, X2 and V9, V10
    and V11. Contacted the run coordinator to determine if this was a
    problem. The FPP is not needed for the current kinematic, so we will
    not worry about the HV for now.


    FIGURE 1

    FIGURE 2