Main INDEX
Monthly INDEX
PREV
NEXT
User name Meziani
Log entry time 00:04:21 on July 4,2007
Entry number 207439
keyword=Shift Summary
16:00 shift start
17:00 Javier and Jack still down in the Hall dealing with the Q3 magnet issue
18:30 Hall in beam permit
19:00 J. Benesch called and said he could get 300 microns x 300 microns beam. Getting better would require a couple of hours.
We are accepting the beam which is in the upper limit of our specs
19:04 MCC start setting up Hall A line
19:15 Beam is delivered on Be0 target (8 microA)
Beam spot runs on BeO: 4217,4218
20:00 Checking alignment and Raster size (Alex and Nikos)
Beam spot runs on Carbon hole: runs 4221 to 4229
21:20 Quasielastic run #4230 to 4232
21:30 Asked for controlled access
22:00 Ed and Jack down in the Hall to spectrometers angles.
22:10 Quads and dipoles cycled to get to the new momentum values
HV on Hadron/Right S1 set to 72% of nminal max
trigger downloaded (E'=527.9, Pr=1.217)
22:55 Jack and Ed back. Asked for beam to start production runs.
23:20 Jay Benesh asked to move the position of the beam by 1 mm to
be able to raise the current from 70microA to 101microA
the values of BPMs are:
BPMA x = -2.95 y= 1.6
BPMB x = -3.00 y= 1.5
23:40 Production run Elastic-3He
# 4234 #events= 0.42M
# 4235 #events= 225K
# 4236 #events= still going
24:00 End of shift