Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 01:44:54 on November16,2007
Entry number 214709
Followups:
keyword=Beam status
Beam status:
When shift started, beam unstable. After some tuning, it became stable
(10 uA). Since the rate is high at this angle, I asked MCC to not worry about going high for now. But the BPMA x position was +1 mm
(instead of -1 mm). They tried for some time, but could not bring it
down. Also FFB has a problem (see ELOG 1401251).
We are taking data with 10 uA and monitoring beam position.