• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 07:29:24 on November16,2007

    Entry number 214814

    keyword=optics study with left spectrometer

    Left spectrometer completed production data taking. While waiting for right arm to settle into the last momentum, we are taking optics data on the left arm. Sieve slits in.
    For LH2, p=2293 MeV, dp=+2%, run 2494
    p=2248 MeV, dp=0%, run 2495
    p=2202.075 MeV, dp=-2%, run 2496
    For optics target, p=2202.075 MeV (QE), run 2497.