Main INDEX
Monthly INDEX
PREV
NEXT
User name Solvignon
Log entry time 00:01:42 on November17,2007
Entry number 214960
keyword=Shift summary
SWING shift / P.Solvignon (SL), D. McNulty (TO), E. Chudakov(3rd)
==================================================================
Main
----
16:44 MCC done with beam study. Now tuning the beam for Hall A.
17:15 Beam ready
17:24 Raster size check
17:30 Ask for 50uA. Compton rates are 50kHz/uA so ask for some tuning.
17:42 Compton rate down to 15kHz/uA. Start production
18:13 Left DAQ problem. Alex is on its way.. Keep taking data with right arm.
19:43 Ask for controlled access
20:38 Beam permit. Still same problem with left DAQ.
21:50 Ask for controlled access
Left HRS
--------
momentum to 3.906 GeV/c, theta=15deg
17:42 Run 2508, 283k, 50uA on Fe-left
17:56 Run 2509, 228k, 50uA on C-left
changing momentum to 3.642 GeV/c
Right HRS
---------
momentum to 3.160 GeV/c, theta=15deg
17:42 Run 20903, 1.3M, 50uA on Fe-left
17:56 Run 20904, 1.1M, 50uA on C-left
18:49 Run 20906, 2.0M, 50uA on H2
19:07 Run 20907, 1.3M, 5uA on Pb
19:15 changing momentum to 2.982 GeV/c
21:12 Run 20909, 3.4M, 30uA on Dummy-10cm
21:39 Run 20910 1.1M, 50uA on C-left