November 17, 2007 Owl Shift Summary
Owl Shift Crew:
V. Sulkosky (SL), Y. Oh (TO)
Summary
=======
00:00 Start shift in Controlled Access to fix fastbus crate
power supply for the VDCs.
01:50 Power supply replaced, Alexandre and Bob are swapping out
the TDC module that was replaced during Swing shift in ROC3 slot 4.
02:25 Alexandre and Bob are out of the Hall. Hall A is in Beam Permit.
02:35 Beam back checking beam position and raster.
02:45 Noticed that left Q2 tripped off at 2:38 due to an overtemp
fault. Called RC and paged tech-on-call, since fault will not clear.
03:20 After consulting with Heidi, I requested a controlled access to
reset the left Q2 power supply to clear the fault.
05:05 MCC called, they have an RF problem in the injector. Beam will
be off for a while.
06:30 Right Q1 has been recovered and the dipole liquid helium level
is almost normal.
06:55 Asked for Beam Permit.
07:00 Began ramping right dipole to set momentum.
07:33 Mask target to move to Carbon beam Left.
07:49 Move to Iron beam left target.
Left HRS
========
momentum at 3.396 GeV/c, theta=15deg
07:26 Run 2555, 328k, 10uA on 10 cm Dummy
07:40 Run 2556, 380k, 10uA on Beam Left Carbon
07:54 Run 2557, 488k, 10uA on Beam Left Iron