16:00 Shift start
16:00 - 20:25 Working at Hall
19:45 - Rising Heat Load of Loop 1 and Loop 3. Step: 3 minutes. Step size: 1.0
20:20 - Jack called from Hall. He finishes in 2 minutes
20:20 - Call MCC to sweep the Hall
20:32 - Right Arm On. Polarisation: positive
21:10 - Sweep finished. Switch to power permit
21:14 - Beam permit
21:30 - Harp scan.
21:55 - Harp scan ended.
21:55 - Setting up the beam position.
22:10 - Setting up Compton polarimeter
23:15 - Beam ready, back to the exp!
23:23 - Stop again, callibration of the beam by MCC
23:25 - Beam on
23:28-23:34 - Run 21456, He, 14.9 uA, positrons
23:43-23:53 - Run 21457, Pb, 6.25 uA, positrons
00:00 - Shift ends