• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name C. Fernandez-Ramirez

    Log entry time 00:03:07 on December 4,2007

    Entry number 218226

    keyword=Swing shift summary

    16:00 Shift start
    16:00 - 20:25 Working at Hall
    19:45 - Rising Heat Load of Loop 1 and Loop 3. Step: 3 minutes. Step size: 1.0
    20:20 - Jack called from Hall. He finishes in 2 minutes
    20:20 - Call MCC to sweep the Hall
    20:32 - Right Arm On. Polarisation: positive
    21:10 - Sweep finished. Switch to power permit
    21:14 - Beam permit
    21:30 - Harp scan.
    21:55 - Harp scan ended.
    21:55 - Setting up the beam position.
    22:10 - Setting up Compton polarimeter
    23:15 - Beam ready, back to the exp!
    23:23 - Stop again, callibration of the beam by MCC
    23:25 - Beam on
    23:28-23:34 - Run 21456, He, 14.9 uA, positrons
    23:43-23:53 - Run 21457, Pb, 6.25 uA, positrons
    00:00 - Shift ends