NEXT
User name Z. Meziani
Log entry time 08:01:03 on December 5,2007
Entry number 218417
keyword=Shift Summary
Shift Begins
00:00
Change momentum setting on both arms
p0=642.76 MeV/c dp/p = 0%
Target 12 C (Carbon Elastic Calibration)
00:13-00:18 Run # 3340 evts: 1.9M Collimators Open.
Move target to Optics target
10uA, dp/p=0%
Runs # 3341 (left,SSlit OUT) evts:2.5M
21481 (right,SSlit OUT) evts:2.8M
50uA Sieve Slits In dp/p=0%
Runs # 3342 (left,SSlit IN) evts: 1.58M
21482(right,SSlit IN) evts: 1.8M
Changing momentum on both arms to
p0=629.91MeV/c dp/p = -2%
50uA
01:10-01:16 Run # 3343 (left, SSlit IN) evts:1.5M
10uA
01:24-01:24 Run # 3344 deadtime too high
01:26-01:34 Run # 3345 (left SSLit OUT) evts:2.4M
01:30-01:47 Run # 21483 (right,SSLit IN)evts:1.5M
01:40-01:46 Run # 3346 (left,SSlit,OUT) evts:1.9M
01:58-02:07 Run # 21484 (right,SSlit,OUT)evts:2.7M
02:04-02:07 Run # 3347 (left, SSlit,IN) evts:0.3M
50uA
02:16-02:25 Run # 3348 (left,SSlit OUT)
The rest of runs are summarized in separate elogs.
Finished Optics runs and calibration runs (see elog)
Finished scan of beam on empty target
06:10 Both spectrometers at set at 40 degrees.
15uA
Start the scan with the 208 Pb target.
Check the reconstructed target. Changed the momentum of the left arm
to p0=0.61705 GeV/c.
Scanning the lead target
07:25 Changing the momentum to 330. MeV and taking data for
the crystal calibration.
Shift Ends
<\pre>