    User name L. Zhu

    Log entry time 15:58:28 on December 5,2007

    Entry number 218427

    keyword=Shift Summary

    8:05 beam off for pass change
    9:00 set the right HRS angle to 60 degree: 60 floor/-34.2 vernier
    set the right HRS momentum to 1.211563 GeV/c after cycling Q2,Q3
    9:30 set the left HRS angle to 60 degree: 60 floor/+31.1 vernier
    set the left HRS momentum to 1.211563 GeV/c after cycling Q3.
    Jack will work on Q2 after the beam pass change.
    13:00 MCC did harp scan with
    1HA1H03A sigma x=0.0645+-0.0137 sigma y =0.071+0.0278
    1HA1H03B sigma x=0.2062+-0.0209 sigma y=0.1614+-0.0415
    we asked for controlled access
    16:00 close to the end of controlled access