• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jose

    Log entry time 02:27:13 on December 9,2007

    Entry number 219197

    keyword=Hall A tools snapshot

    At 02:15 both spectrometers are back on line and settled down. There are two RED readings for left D-G dipole (99.7) and rigth Q3 (100.1), presumably because of too high values.


    FIGURE 1