Main INDEX
Monthly INDEX
PREV
NEXT
User name Ole Hansen
Log entry time 00:02:14 on December11,2007
Entry number 219784
keyword=Swing shift summary
16:00 Start shift with no beam. Tuning for Hall C in progress.
20:30 Beam returns. Doing OTR check, Compton rate check (requires Compton DAQ restart), harp scans. All ok,
21:05 Start production data taking with E_beam = 739 MeV, theta = 120 degrees.
21:05--24:00 Smooth data taking.
Run summary
Left arm:
Run# p (MeV) Target
3681 711.973 Fe (right)
3682 C (right)
3683 Pb
3684 663.820 Pb
3685 C (right)
3686 Fe (right)
3687 618.924 Fe (right)
3688 Fe (left)
3689 C (left)
3690 dummy
3692 Pb
3693 4He
3694 577.064 4He
3695 Pb
3696 dummy
Right arm:
Run# p (MeV) Target
21726 711.973 Fe (right)
21727 C (right)
21728 Pb
21729 618.924 Fe (right)
21730 Fe (left)
21731 C (left)
21732 dummy
21734 Pb
21735 4He