keyword=day shift summary
08:00 Finishing kinematics #5;
10:01 Left Q1 trip, tried reset but the main power wouldn't turn on;
10:25-11:10 Controlled access to fix left Q1;
12:45 Right arm is finished, set momentum to 2.791 GeV/c
13:57 Finished all production runs. Now start BCM calibration;
Some trouble with the Fcup limit...
16:00 BCM calibration still going on.
Run list:
Left:
-----
Run# Target Ibeam Time #Events Comments
4296 He(LP1) 15 10 2.82M Kine 5
4297 He(LP1) 15 5 1.41M Kine 6, high deadtime (20%)
4298 He(LP1) 15 10 2.26M Kine 6
4299 Pb(LP2) 5 10 2.03M Kine 6
4300 He(LP2) 5 9.5 1.58M Kine 6
4301 Pb(LP3) 15 10 2.93M Kine 6
4302 H2(LP3) 15 5 1.26M Kine 6
4303 Dumm10cm 15 5 1.45M Kine 6
4304 C12 15 1 141K Kine 6, very short, Left Q1 trip
4305 C12 15 10 1.81M Kine 6
4306 Fe 15 10 1.62M Kine 6
4307 He(LP1) 15 10 3.08M Kine 7
4308 Pb(LP2) 5 10 2.02M Kine 7
4309 He(LP2) 5 7 1.25M Kine 7
4310 Pb(LP3) 15 0.5 short run to check PS
4311 Pb(LP3) 15 10 1.68M Kine 7
4312 H2(LP3) 15 5 1.32M Kine 7
4313 Dumm10cm 15 5 1.09M Kine 7
4314 C12 15 10 1.62M Kine 7
4315 Fe 15 10 1.51M Kine 7
Right:
------
Run# Target Ibeam Time #Events Comments
22161 He(LP1) 15 10 2.78M Kine 5
22162 Pb(LP3) 15 10 2.93M Kine 7
22163 H2(LP3) 15 5 1.27M Kine 7
22164 Dumm10cm 15 5 1.36M Kine 7
22165 C12 15 10 1.79M Kine 7
22166 C12 15 10 1.69M Kine 7
22167 C12 15 10 1.69M Kine 7
22168 Fe 15 10 1.51M Kine 7
22169 He(LP1) 15 10 3.12M Kine 7
22170 Pb(LP2) 15 10 1.96M Kine 7
22171 He(LP2) 15 5 1.23M Kine 7