NEXT
User name jpchen
Log entry time 08:05:03 on January 4,2008
Entry number 222612
keyword=Owl shift summary
Owl shift summary:
Shift workers: J. P. Chen (SL), X, Yan (TO)
0:00 no beam: RSEP8A and A slit problems.
1:20 MCC started beam tuning.
2:00 pulsed beam then CW beam, Compton rate very high (MHz).
3:00 After pathlength adjustment, Compton rates still high (~500KHz).
Decided to go straight through.
4:20-4:40 harp scan, OTR
4:40 started position scan with Empty target
5:05 check raster size
5:15 Pb target position scan
6:20 production
6:25 MCC has problem with magnet shunt power.
7:11 beam back, resume production
7:25, beam off, ioc trip.
7:56, beam back.
E0=3680 MeV, both angle at 15 degree.
Left P=3557.302 MeV, Right P=3092.526 MeV
run 4392/22233, Empty target position scan
run 4393-4394/22234-22235, Raster check
run 4395/22236, Bx=-3mm, Ax=0, Pb position scan
run 4396/22237, Bx=-2mm, Ax=0
run 4397/22238, Bx=-1mm, Ax=0
run 4398/22239, Bx=-4mm, Ax=0
run 4399/22240, Bx=-5mm, Ax=0
run 4400/22241, Bx=-3mm, raster size adjustment (1.4x2.8 mm)
(run 4401/22242, raster 1.5x2.5mm)
Production
Left P=3557.302 MeV
run 4401, 20 uA on Pb, raster 1.5x2.5mm, 6:20-6:25, 241K
run 4402, 20 uA on He, 7:12-7:21, 938K.
run 4403 20 uA on LH2.
Right P=3092.526 MeV
run 22242, 20 uA on Pb, 1.5x2.5mm raster, 6:20-6:25, 629K
run 22242, 20 uA on He, 7:12-7:21, 2.2M.
run 22243, 20 uA on LH2.