• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 08:05:03 on January 4,2008

    Entry number 222612

    keyword=Owl shift summary

    Owl shift summary:
    Shift workers: J. P. Chen (SL), X, Yan (TO)
    
    0:00 no beam: RSEP8A and A slit problems.
    1:20 MCC started beam tuning.
    2:00 pulsed beam then CW beam, Compton rate very high (MHz).
    3:00 After pathlength adjustment, Compton rates still high (~500KHz).
    Decided to go straight through.
    4:20-4:40 harp scan, OTR
    4:40 started position scan with Empty target
    5:05 check raster size
    5:15 Pb target position scan
    6:20 production
    6:25 MCC has problem with magnet shunt power. 
    7:11 beam back, resume production
    7:25, beam off, ioc trip.
    7:56, beam back.
    
    E0=3680 MeV, both angle at 15 degree.
    
    Left P=3557.302 MeV, Right P=3092.526 MeV
    run 4392/22233, Empty target position scan
    run 4393-4394/22234-22235, Raster check
    run 4395/22236, Bx=-3mm, Ax=0, Pb position scan
    run 4396/22237, Bx=-2mm, Ax=0
    run 4397/22238, Bx=-1mm, Ax=0
    run 4398/22239, Bx=-4mm, Ax=0
    run 4399/22240, Bx=-5mm, Ax=0
    run 4400/22241, Bx=-3mm, raster size adjustment (1.4x2.8 mm)
    (run 4401/22242, raster 1.5x2.5mm)
    
    Production
    Left P=3557.302 MeV
    run 4401, 20 uA on Pb, raster 1.5x2.5mm, 6:20-6:25, 241K
    run 4402, 20 uA on He, 7:12-7:21, 938K.
    run 4403 20 uA on LH2.
    
    Right P=3092.526 MeV
    run 22242, 20 uA on Pb, 1.5x2.5mm raster, 6:20-6:25, 629K 
    run 22242, 20 uA on He, 7:12-7:21, 2.2M.
    run 22243, 20 uA on LH2.