    User name M.Olson

    Log entry time 08:00:32 on January 5,2008

    Entry number 222764

    keyword=OWL Shift Summary

    OWL Shift Summary: [M.Olson, J.P. Chen]
    
    At beginning of shift:
    CHL down
    No beam
    Target loops warm (~100K)
    Work on-going to restore CHL
    
    
    0358: CHL and target work complete. 
    Called MCC, asked for beam permit
    
    0415: Problems resetting LHRS & RHRS quads remotely, asked for controlled 
    access for JP to go in and perform local reset. Dipoles resetting OK.
    
    0515: R-Q3 will not engage locally, although all of the faults have been 
    cleared. MCC putting hall back into beam permit to allow for tuning. We plan to 
    call the on-duty tech in at the beginning of day shift.
    
    *** All other RHRS and LHRS magnets have been reset. 
    
    *** L-Q2, L-Q3, and R-Q2 were all cycled IAW instructions and are at their 
    setpoints.
    
    *** Left Dipole is at setpoint, and the right dipole is SLOWLY getting to its 
    setpoint. 
    
    
    Beam tuning continued through end of shift.
    No production running.