Main INDEX
Monthly INDEX
PREV
NEXT
User name M.
Log entry time Olson
Entry number 08:02:39 on January 6, 2008
keyword=Owl Shift Summary
0010: Compton rate at 30kHz/uA, Asked MCC to tune
0013: p0_L to 0.69934GeV/c, Target to He (beam compensation on)
0055: MCC reports beam down due to loss of cyogenics.
0100: Switching p0_R to 0.652043 GeV/c, going to C12 target
Lost CHL and ESR, accelerator down, all magnets tripped
Target loops vented
Set controlled access. Survey complete
0330: Cryo reports that we can start recovery
0550: Spectrometer magnets reset
p0_L = 0.69934 GeV/c
p0_R = 0.65204 GeV/c
0615: JP out of hall, Hall A ready for beam
Putting in empty target to allow MCC to bring tune beam
0625: Request harp scans on A and B
A: 244x276 um
B: 134x236 um
0635: Checked raster: (Run 4464_Left) Looks OK
Inserting C-12 target
Resuming production @ 50 uA
OTR looks OK
Compton rate a little high (~25kHz/uA)
Giving MCC some time to tune
0705: p0_L to 0.65204 GeV/c, target to He (beam compensation on)
Compton rate much improved (1.5kHz/uA @ 50uA)
L_Run R_Run p0_L p0_R Target Comments
--------------------------------------------------------
4459 22282 0.75007 0.69934 C12 Production
4460 22283 0.75007 0.69934 Fe
4461 22284 0.69934 0.69934 He Production
4462 22285 0.69934 0.69934 Pb Production
4463 22286 0.69934 0.69934 Dummy Production
***Cryo loss and recovery***
4464 ----- 0.69934 0.65204 Empty (5uA) Raster Check
4465 22287 0.69934 0.65204 C12 Production
4466 22288 0.69934 0.65204 Fe Production
4467 22289 0.65204 0.65204 He Production
4468 22290 0.65204 0.65204 Pb Production
4469 22291 0.65204 0.65204 H2 Production
4470 22292 0.65204 0.65204 Dummy Production