• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 14:41:23 on January20,2008

    Entry number 226400

    This entry is a followup to: 226398

    keyword=re: empty target

    We found out from Dave Meekins that indeed the empty
    target is in between the BeO and Tantalum, as indicated
    in the BSD positions. There was no room to put empty
    at the bottom of the structure, so a 1/4" gap was put
    in between the bottom 2 targets.

    We are at empty target and MCC is tuning to the beam dump.