Main INDEX
Monthly INDEX
PREV
NEXT
User name D McNulty
Log entry time 14:29:54 on January28,2008
Entry number 227734
keyword=Work done in hall during afternoon access on 1/26/2008
Yesterday during Hall access (between 5:30 - 7:00 PM), the following work was done:
S0 was moved out of the acceptance of the thin and stack PREx detectors (it was simply placed to the far side of the VDC). We plan to re-insert it just before our 1pass detector tests.
Lumi 1 signal problem was determined to be cabling problem--likely another faulty fat twinax connector at the beamline end of the cable. The Lumi1 signal was re-routed through the last spare line and is currently working. Connectors should be repaired during soonest convenient access.