    User name D McNulty

    Log entry time 14:29:54 on January28,2008

    Entry number 227734

    keyword=Work done in hall during afternoon access on 1/26/2008

    Yesterday during Hall access (between 5:30 - 7:00 PM), the following work was done:

    S0 was moved out of the acceptance of the thin and stack PREx detectors (it was simply placed to the far side of the VDC). We plan to re-insert it just before our 1pass detector tests.

    Lumi 1 signal problem was determined to be cabling problem--likely another faulty fat twinax connector at the beamline end of the cable. The Lumi1 signal was re-routed through the last spare line and is currently working. Connectors should be repaired during soonest convenient access.