    User name Seonho Choi

    Log entry time 00:02:08 on January29,2008

    Entry number 227802

    keyword=Shift summary, Swing, Jan 29.


    HAPPEX run summary from 1/28 Swing Shift

    16:14 Oversampling set back to zero. Starting a new run 10414
    17:13 Moving to C target. Starting HRS DAQ (run 3563)
    18:20 MCC having problem with IOC. Beam off.
    18:50 ATLis test finished. Asking for Controlled Access to work on Compton and Lumi
    20:05 MCC fixed IOC problem. Beam will be back soon. Hall is still under controlled access.
    20:55 MCC has vacuum problem. An expert has been called in. About an hour to the beam.
    22:00 MCC has fixed the vacuum problem. Alex and Vince have fixed the scaler problem and leaving the hall. Basically ready for the beam.
    22:23 Beam back starting HAPPEX run 10418. 10uA on Carbon target.
    23:59 At the end of the shift, Luis and Dustin is doing some LUMI tests.

    If not noted otherwise run has been analyzed and regression has been done

    IHWP OUT
    Run # Target Raster size Current Notes
    10413 Thin Pb 6x4 60 OS=1, Dithering Off
    10414 Thin Pb 6x4 60 OS=1, Dithering Off Oversampling set to zero.
    10415 Thin Pb 6x4 60 OS=0, beam current reduced to 10uA for Compton work
    10416 Carbon off 5.0 ATLis test
    10417 Carbon off 5.0 Scans
    10418 Carbon 6x4 10 OS=0

    High Voltages for 60 uA on Thin Pb with OS=1
    720
    765
    775
    1625
    652
    1045
    768
    888

    High Voltages for 60 uA on Thin Pb OS=0
    X
    685
    685
    1500
    570
    930
    680
    790