HAPPEX run summary from 1/28 Swing Shift
16:14 Oversampling set back to zero. Starting a new run 10414
17:13 Moving to C target. Starting HRS DAQ (run 3563)
18:20 MCC having problem with IOC. Beam off.
18:50 ATLis test finished. Asking for Controlled Access to work on Compton and Lumi
20:05 MCC fixed IOC problem. Beam will be back soon. Hall is still under controlled access.
20:55 MCC has vacuum problem. An expert has been called in. About an hour to the beam.
22:00 MCC has fixed the vacuum problem. Alex and Vince have fixed the scaler problem and leaving the hall. Basically ready for the beam.
22:23 Beam back starting HAPPEX run 10418. 10uA on Carbon target.
23:59 At the end of the shift, Luis and Dustin is doing some LUMI tests.
If not noted otherwise run has been analyzed and regression has been done
IHWP OUT
Run # Target Raster size Current Notes
10413 Thin Pb 6x4 60 OS=1, Dithering Off
10414 Thin Pb 6x4 60 OS=1, Dithering Off Oversampling set to zero.
10415 Thin Pb 6x4 60 OS=0, beam current reduced to 10uA for Compton work
10416 Carbon off 5.0 ATLis test
10417 Carbon off 5.0 Scans
10418 Carbon 6x4 10 OS=0
High Voltages for 60 uA on Thin Pb with OS=1
720
765
775
1625
652
1045
768
888
High Voltages for 60 uA on Thin Pb OS=0
X
685
685
1500
570
930
680