• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name spiegel/Tech

    Log entry time 10:57:04 on February 05, 2008

    Entry number 228549

    keyword=Post beam checklist / Extended maintenance

    Post-Beam checklist complete. All window gaurds installed. Tech ¨On Call¨ at shutdown is: Todd Ewing No Issues found. NOTE: Spectrometers, EP, Beamline(Moeller)and Exit beam pipe turbo backing pumps are ¨ON¨ w/ valves shut off.

    A copy of this log entry has been emailed to: folts@jlab.org,stevensm@jlab.org,segal@jlab.org,spiegel@jlab.org