• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name paschke

    Log entry time 19:37:00 on February12,2008

    Entry number 228558

    keyword=two beams in injector, screenshots

    Running both beams in the injector, with Hall C stopped at the master slit.
    
    
    


    FIGURE 1

    FIGURE 2