• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Jack

    Log entry time 14:28:07 on April 01, 2008

    Entry number 229347

    keyword=Left Arm VDC cabling OK at Fastbus crate

    While I was in the hall I went up to look at the cabling to the inputs of the TDCs on the Left Arm, for the VDCs. None of the cables seem flipped and all the connectors seem to be seated correctly. None of the connectors are shifted one row of pins over, i.e. the TDC would be getting only half the ECL signal.