User name dhamilton
Log entry time 08:11:23 on April 02, 2008
Entry number 229524
keyword=Owl Shift Summary
Started shift during run 2147 (optics run with sieve slit on LH2 target,
BB HV off).
00:25 - Run 2147 ended.
Q2 and Q3 current set to 0A, then cycled through 1400A.
00:45 - Optics run 2148 (following Q2 and Q3 power cycle) started.
T3/T7 rate is 200Hz/65Hz at 13.6 microamps.
01:15 - Run 2148 ended.
Target moved to Carbon foil.
BB E and dE HV switched on (MWDC also switched on at 1500V at Nilanga's
request).
Beam at 5 microamps.
01:32 - Run 2149 started.
E-dE plots checked.
Discriminator thresholds changed.
HV changed.
Several iterations over runs 2149 - 2163.
Run 2162 had MWDC HV set to 1300V.
Run 2163 had MWDC HV set to 1350V.
06:05 - target moved to LH2.
Prescales set for coincidence running.
1 microamp requested from MCC.
Run 2165 started.
06:10 - HV trip and problems with ROC5.
Problems fixed. Start run 2166.
06:50 - problems with ROC5 again. Increased beam current to 3 microamps
in an attempt to stabilise the beam position. Started run 2168.
08:00 - continued elastic data-taking, with small changes to the
discriminator thresholds. Problems with ROC5 persist.