Log entry time 08:17:32 on April 04, 2008
Entry number 229857
keyword=Owl Shift Summary
Shift started at the end of BB MWDC HV/threshold scan.
Run 2277 was the last setting for this sca (1450V, 12.5V).
00:20 - Start of elastic optics data-taking.
Sieve slit moved into position.
BB MWDC HV set to 1450V.
BB MWDC threshold set to 5V.
BB coil current still at 390A.
Run 2278 (BB 390A, 100k events) - ended early due to loss of beam.
01:10 - MCC called to say that beam will be off while they cycle their
magnets.
02:20 - MCC called again. There is a problem with one of the arcs.
Someone has been called to come in and try to fix it.
05:00 - beam restored to hall.
Run 2279 (BB 390A) - ended early.
Immediate BB HV trip due to bad beam alignment.
Target changed to BeO and alignement checked.
05:55 - restart data-taking.
Another HV trip due to drift in beam y position.
05:30 - target changed back to 6cm LH2. Data-taking resumes.
Run 2280 (BB 390A) - ended early.
Another HV trip due to instability in beam y position.
06:00 - move to empty target and request harp scan (all sigmas less than
200 microns).
06:45 - move to BeO target to check spot position again (still fine).
06:55 - move to LH2 target to restart data-taking.
Run 2281 (BB 390A) - ended early.
The same problem in beam position instability.
07:20 - spoke to the crew chief.
They are going to try to identify the source of the problem. He suggested
leaving the running conditions unchanged for now.
07:30 - MCC have had some success identifying that the problem appears to
be occurring before the locks.
Changing to empty target to allow them to investigate further.
07:50 - BB MWDC HV switched off.
08:00 - shift ended with no beam and no solution to the problem with
periodic instability in beam y position.