Main INDEX
Monthly INDEX
PREV
NEXT
User name Lindgren
Log entry time 18:37:15 on April 5,2008
Entry number 230129
keyword=Shift Summary
Day Shift Summary
Start 8:09 Run 2325 HRS=20.5, C Target, BB=390 A Events = 0.220M
Start 8:27 Run 2326-2327 HRS=20.5, LH2 Target, BB=390 A pi0 Test
Start 8:38 Runs 2328-2329 HRS=20.5, LH2 Target, Dead Time Test
good data below
Start 8:45 Runs 2330 HRS=20.5, LH2 Target, pi0 Events=0.48M
Start 8:45 Runs 2331 HRS=20.5, LH2 Target, pi0 Events=0.42M
Control Access
See comments in Halog by Brad and others
Enter Hall to change gas on drift chambers and lower BigBite Sieve Slit. Note Balloons are still inflated.
Back to Beam permit
Move HRS from 20.5 to 35.5
No beam until about 1400.
Beam back about 1400
Put in C holey target, Check raster with spot++ Beam centered very well.
Take elastic data in HRS and Recoil protons in BigBite
With SIEVE IN
Start 14:26 Run 2340 HRS=35.5, LH2 Target, BB=390 A Events = 0.5M
Start 15:26 Run 2341 HRS=35.5, LH2 Target, BB=390 A Events = 0.5M
(Event Recorder Crashed)
Start 15:49 Run 2342 HRS=35.5, LD2 Target, BB=390 A Events = Junk
(ROC5) Crashed
Run 2343 - 2344 ROC5 Crashed
Good data below
Start 16:21 Run 2345 HRS=35.5, LD2 Target, BB=390 A Events = 0.43M
Start 16:27 Run 2346 HRS=35.5, LD2 Target, BB=390 A Events = 0.52M